Dec 4, 2023

Junkyard Train

Today, once again we ride a freight train of Allentown's great industrial past. In the early 1970's, the Redevelopment Authority tore down the neighborhood on either side of the Lehigh Street hill. At that time they had persuaded Conrail to move the the Barber's Quarry Branch line exclusively to the southern side of the Little Lehigh. The branch had crossed over and back to service the great Wire Mill. After crossing Lehigh Street, the train would proceed along the creek passing under the 8th Street Bridge. At the 10th Street crossing it would service another great industrial giant, Traylor Engineering. In 2009 President Obama visited a successor, Allentown Manufacturing, which has since closed. The line would continue along the creek until it turned north along Cedar Creek to Union Terrace. After crossing Hamilton Street by the current Hamilton Family Diner, it would end at the current park department building. Nothing remains of the line, the tracks were removed. The Allentown Economic Development Corporation recently received a grant to rebuild the line to 10th Street, even though the plant Obama visited has closed. The neighboring former Mack Plant now houses a go cart track. How the money will be squandered remains to be seen. The top photograph was taken by local train historian Mark Rabenold in 1989. It shows the later relocated section of the track that was just east of the Lehigh Street crossing.

reprinted from March of 2011

1 comment:

  1. I remember the train running thru but before that was a junk yard it was a nursery with plants...it belonged to my father in law...was called Kratzers nursery

    ReplyDelete

ANONYMOUS COMMENTS SELECTIVELY PUBLISHED. SIGNED COMMENTS GIVEN MORE LEEWAY.