photo by Tami Quigley |
The top photo shows the Robin Hood Bridge, before the Wildlands Conservancy demolished the little Robin Hood Dam, just downstream beyond the bridge. The dam was only about 10 inches high, and was built as a visual effect to accompany the bridge in 1941. It was the last WPA project in Allentown, and considered the final touch for Lehigh Parkway. Several years ago, the Wildlands told the Allentown Park Director and City Council that it wanted to demolish the dam. The only thing that stood between their bulldozer and the dam was yours truly. I managed to hold up the demolition for a couple weeks, during which time I tried to educate city council about the park, but to no avail. If demolishing the dam wasn't bad enough, The Wildlands Conservancy piled the broken dam ruble around the stone bridge piers, as seen in the bottom photo. I'm sad to report that the situation is now even worse. All that ruble collected silt, and now weeds and brush is growing around the stone bridge piers. I suppose the Wildlands Conservancy considers it an extension of its riparian buffer.
The Wildlands Conservancy should be made to remove, piece by piece, all the rubble that they piled around the bridge piers, despoiling the bridge's beauty. City Council should refrain from ever again permitting The Wildlands Conservancy to alter our park designs.
ADDENDUM JULY 9, 2018: It has been five years since the dam's destruction in 2013, and the bridge piers look more disgusting than ever. While Allentown has the third Pawlowski appointed park director taking orders from the Wildlands Conservancy, we do have a new mayor. Hopefully, Ray O'Connell will wrestle park system decisions back to the city.
If it is on fact SILT contact the EPA
ReplyDeleteMM, who does a inner city dweller sue for there child contracting lime disease in Allentown's wall of weeds? The City of Allentown or the Wildlands Conservancy being stuck in the city there is no other place it could have been contracted!
ReplyDelete