LOCAL, STATE AND NATIONAL MUSINGS

Showing posts with label Bridges. Show all posts
Showing posts with label Bridges. Show all posts

May 22, 2012

Pawlowski's Poor Priorities

The former Barber Quarry rail spur is no secret. The line ran along the Little Lehigh, under both the 8th Street and 15th Street Bridges, ending up near the present day Hamilton Family Diner. I have posted about it often; The Train of Lehigh Parkway, also The Train of Union Terrace and The Junkyard Train. It has played a role in several City plans. It's former railbed would be incorporated into the Trail Network Plan, and the AEDC received a grant to perhaps reinstate the rail line. Both these projects have been covered here at molovinsky on allentown. Today we are told that construction of the 15th Street Bridge replacement will be delayed because of arsenic found by the former railbed. Arsenic, and other pesticides were previously used to make railroad ties. This also is no secret. We are a city which can work with the state government to fast track development for political and private benefit, but are content to have the entire southside isolated. When construction finally does begin, it was suppose to start last November, the bridge will be closed in both directions for over a year. Schreiber's Bridge, the 184 year old stone structure a quarter mile west, has been taking a pounding.*  In 1957 the 15th Street Bridge opened, finally providing a good connection between South Allentown and the remainder of the city. Because Pennsylvania was considering it's replacement, Community Development Director Pawlowski, under Afflerbach, didn't have it's metal beam structure painted. Because Mayor Pawlowski has been consumed with Transforming Allentown, no haste has been applied to the bridge project. While the politicians and press lament about the Hole at 8th and Hamilton, I'm concerned about the quality of life issues; That bridge is one of them.

*This blog has noted the on going damage to Schreiber's Bridge from heavy use with just one lane of 15th Street Bridge currently closed.  This blogger personally informed Mayor Pawlowski of the damage. 

Apr 17, 2012

A Failure To Prioritize

In a recent Morning Call article, about making the entrance road into Lehigh Parkway one way because of a leaning WPA wall, the City defended itself citing priorities. That's exactly the problem in Allentown, misplaced priorities. While the irreplaceable WPA icons have been allowed to crumble, we have macadamized every walking path in Cedar Park. While we concentrate on a new bridge over the Lehigh River for the American Parkway, we allowed the 15th Street Bridge to rust away. Now, because the 15th Bridge is half closed, the historic Schreibers Bridge is being damaged by intensive traffic and heavy trucks. An article in yesterday's Morning Call concerns Allentown possibly overcharging the suburbs for sewage. The article fails to mention that both the City and The Lehigh County Authority have been cited for sewage overflow into the Little Lehigh Creek. and mandated by the DEP to upgrade the system. Both political entities concern themselves with expansion and cash flow while ignoring infrastructure and our quality of life; A failure to prioritize.