Apr 18, 2012

State Of The Parks


The Park Master Plan, done by a Philadelphia planning firm, and commissioned by the Trexler Trust in 2005, concluded that Cedar Park was being loved to death. Since then, construction and activity in that park has at least doubled. The mega destination playground attracts hundreds of children whenever schools out. The parking lot for the swimming pool is filled with cars for the playground. This summer, pool patrons will be forced to park on the grass. All the paths on the rose garden side of Ott Street have been paved, and a new path constructed across the former open space between the garden and picnic pavilions. Also, a new water line has been laid through that section to feed the demands of western Lehigh County, while the waste return will flow along side the Little Lehigh Creek, through Lehigh Parkway. The parks are just plumbing for the county and recreation for the city. In the Parkway, the entrance road has been made one way, and one side of the bridle path closed, because of the leaning WPA wall. Although $millions of dollars have been spent on over-using Cedar Park, not one cent was spent on maintaining the iconic WPA stone structures. In addition to the wall problem in the Parkway, the steps and pillars at Union Terrace are structurally endangered. While the park department goes ahead with plans to connect the various parks with more bike paths, the WPA steps at fountain park are deteriorating. Welcome to Allentown, where community, infrastructure and history are all ignored, while new projects are planned.

No comments:

Post a Comment

ANONYMOUS COMMENTS SELECTIVELY PUBLISHED. SIGNED COMMENTS GIVEN MORE LEEWAY.